Baseline Package 210: Internal Product Development |
|
|
|
|
Written by Administrator
|
|
Thursday, 13 August 2009 00:00 |
2009/08/12
|
 |
|
|
SAP Best Practices Workshop (2009-08-12) Baseline Package 210: Internal Product Development
Purpose
- nThe business process encompasses all steps necessary to setup and process a project to develop a new product.
- nFurthermore, the scenario is supported by the main cost object controlling functions required, such as preliminary costing and period-end closing.
Benefits
- nSimplified preliminary costing for complex projects
- nRevision levels ensure data consistency
n
Key process flows covered
- nDocument Management (Easy Document Management)
- nAssign a document (KPR) to the material masters of the finished product
- nCreate a project based on a template
- nProduct Data Management with ECM
- nCreate a change number for the design project
- nDisplay the BOM of the new product
- nRedisplay the BOM (effects of change number)
- nAssign revision level to the material master of the new product
- nProduct Cost Controlling
- nMaterial cost estimate for the new product before and after BOM changes (effects of change on price is shown)
- nRecord development (engineering) activities
|
|
Last Updated on Thursday, 13 August 2009 11:07 |